Paywary

Leaderboard / api.companyrecords-api.workers.dev / endpoint

GET https://api.companyrecords-api.workers.dev/api/gov/nrc-licenses

Scores measure reliability and honesty, not output quality.

92Payconfidence: medium
  • Listed only 2 days ago; new listings earn trust over 30 days.
  • Quoted a price different from the listed price on 1 of 10 comparable probes.
Category
Public data by llm, confidence 80%
Latest quote
$0.004 on Base to 0xb849…eAfA
Uptime
100% / 7d, 100% / 30d
Delivery
none not yet paid-tested
Observed
none reported yet (opt-in wrapper telemetry)
HTTPS
yes
First listed
2026-11-16
Last probe
3h ago
Next probe
2026-11-18 18:58 UTC

Score components

Uptime, 7 days
100w 15%
Uptime, 30 days
100w 15%
Valid x402 challenge
100w 15%
Price honesty
90w 15%
Delivery after payment
n/aexcluded
Wallet stability
100w 10%
Listing age
8w 5%
HTTPS
100w 5%

Catalog listings

SourceSchemeNetworkAssetListed pricePay toFlowCurrentLast seen
cdpexactSolanaEPjFWd…Dt1v4000J8vnmB…RdhRdefaultyes5h ago
cdpexactBase0x8335…2913$0.0040xb849…eAfAdefaultyes5h ago
cdpexactPolygon0x3c49…335940000xb849…eAfAdefaultyes5h ago
cdpexacteip155:100x0b2C…Ff8540000xb849…eAfAdefaultyes5h ago
cdpexacteip155:50420x3600…000040000xb849…eAfAdefaultyes5h ago
cdpexactArbitrum0xaf88…583140000xb849…eAfAdefaultyes5h ago
cdpexacteip155:4800x79A0…24d140000xb849…eAfAdefaultyes5h ago
cdpexactstellar:pubnetCCW67T…MI7540000GBIX2M…OAFIdefaultyes5h ago
cdpexacteip155:422200xcebA…118C40000xb849…eAfAdefaultyes5h ago
cdpexactxrpl:0524C55…0000—rDxNZC…f8UJdefaultyes5h ago
cdpexactxrpl:0XRP4065rDxNZC…f8UJdefaultyes5h ago

Listing changes

WhenEventFromTo
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed21194065
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed2000040000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
11h agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.
11h agoprice_changed20004000
2d agodisappeared——
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agoprice_changed16062119
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.
2d agodescription_changedUS NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name.US NRC operating nuclear power reactor licences: plant/unit name, docket number, operating licence number (e.g. DPR-51, NPF-6), reactor type (PWR/BWR), location and state, owner/operator, NRC region and facility page, joined with the NRC daily power status: latest report date, current power level (% of rated) and the last 7 days. Filter by state, operator, reactor type or name. Takes about 15 s; allow a 30 s timeout.

Paid probes

No paid probes yet. Paid probing is off by default and runs weekly per host under a strict spend cap; each paid probe links to its on-chain transaction here.

Delivery checks

Inside each paid probe we ask for something whose correct answer we know, then compare. A pass means the seller delivered what it was paid for; a fail means it charged and returned something wrong; inconclusive means we could not judge (no reference, unknown input shape, or a non-2xx response). Every row carries the request, the response hash and the reference so the verdict can be reproduced. Judged results feed the "Delivery after payment" component (pass 1, error after payment 0.25, fail 0); inconclusive rows are excluded; a fail in the last 14 days caps the verdict at caution. Methodology.

No delivery checks yet. They run inside the weekly paid probe.

Classification history

Every classification is kept; the newest row is the current category. Rules match the listing text; the model is consulted only when the rules are unsure.

WhenCategoryConfidenceMethodVersionEvidence
11h agoPublic data80%llmv1claude-haiku-5-5: Returns US government NRC licence records and reactor power status, an open government dataset rather than company enrichment.
11h agoPublic data50%rulesv1rule public_data matched "gov" in metadata
26h agoPublic data80%llmv1claude-haiku-5-5: Returns US government NRC reactor license records and daily power status, which is an open government dataset rather than company enrichment, chain data, or finance data.
43h agoPublic data50%rulesv1rule public_data matched "gov" in metadata

Probe history

WhenKindStatusLatencyx402ValidQuotedPay toFlags
3h agofree40221 msv2option ok$0.0040xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
10h agofree40269 msv2option ok$0.0040xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
16h agofree402584 msv2option ok$0.0040xb849…eAfAmalformed_challengeprice_above_listingprice_mismatchprice_changed
accepts[9].amount_not_uint_string
23h agofree40262 msv2option ok$0.0020xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
29h agofree402763 msv2option ok$0.0020xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
35h agofree402484 msv2option ok$0.0020xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
41h agofree402552 msv2option ok$0.0020xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
2d agofree402701 msv2option ok$0.0020xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
2d agofree402278 msv2option ok$0.0020xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string
3d agofree402466 msv2option ok$0.0020xb849…eAfAmalformed_challenge
accepts[9].amount_not_uint_string